Hanlan Water Project in Mississauga is now well underway
A major project currently underway in Mississauga is the Hanlan Water Project.
Below are links for each of the three contracts associated with this project.
Contract 1 involves the tunnelling that is taking place along Lakeshore Rd and up Dixie Road to Golden Orchard Drive
Contract 2 involves the open cut work taking place on Dixie Road from Golden Orchard Drive to Eastgate Parkway
Contract 3 involves the open cut and tunnelling work taking place on Eastgate Parkway, Tomken Road and Cawthra Road
Small Arms Ltd.
The starting point for the Hanlan Water Project is next door to the Small Arms Ltd. building, in from of which a mural dealing with local military history is located, at Dixie Road and Lakeshore Road East.
Leave a Reply
Want to join the discussion?Feel free to contribute!